The work to be done under this Contract consists of the following improvements: removal of existing pile system (wood piles, concrete walls and sheet pile walls and associated appurtenances, placement of 28,438 l.f. of 18″ diameter steel piles, approximately 100 feet in length each, placement of 1,632 l.f. of 14″ diameter steel mooring piles with jackets, approximately 35 feet in length each, installation of 24,900 square of concrete deck system, 2,000 c.y. Class 200 rip-rap in place, installation of 5 ton knuckle crane. Of these project components the following are considered deductible bid alternates: Alternate #1 – 4,637 l.f. of 18″ diameter steel piles. Alternate #2 – Installation of 5 ton knuckle crane. Alternate #3 – Placement of 1,344 l.f. of 18″ diameter steel piles, placement of 192 l.f. of 14″ diameter steel batter piles, installation of 2,430 s.f. of precast concrete deck system with topping slab. Alternate #4 – Placement of 5,197 l.f. of 18″ diameter steel piles. Alternate #5 – Placement of 508 l.f. of 18″ diameter steel piles.

Leave a Reply

Your email address will not be published. Required fields are marked *


2 + 5 =

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>