PSU Lincoln Hall Broadway Tower Addition Project – Howard S. Wright Construction, Inc.

A 3-story approx. 3,360 s.f. tower addition to Lincoln Hall. The new addition will house an expanded green room for the main performance hall, as well as two dance/movement studios. The Project also includes modifications to convert an acting studio (Room 55) into a blackbox theatre. Bidders should include only work specified as “Alternate 1”. …

Continue reading ‘PSU Lincoln Hall Broadway Tower Addition Project – Howard S. Wright Construction, Inc.’ »

Hwy 212 and Lawnfield Road Connection Project – Phase 3

Westech Construction, Inc. is working as the Prime Contractor on the Highway 212 and Lawnfield Road Connection Project – Phase 3. The project includes: reconstruction of Lawnfield Road from 98th Court to 97th Avenue. Improvements will include new curbs, sidewalks, bike lanes, signalization of the Lawnfield Road/97th Avenue intersection, street lighting, stormwater drainage improvements and …

Continue reading ‘Hwy 212 and Lawnfield Road Connection Project – Phase 3’ »

OUS and OHSU Collaborative Life Sciences and Skourtes Tower Project

The Owner, a tenancy in common (“TIC”) between the OHSU and OUS, is building a state-of-the-art, health science and life science teaching and research facility on “Unit C” of the Schnitzer Campus owned by OHSU in the South Waterfront area of the City of Portland, Oregon with a U.S. Green Building Council, Leadership in Energy …

Continue reading ‘OUS and OHSU Collaborative Life Sciences and Skourtes Tower Project’ »

Safeway Store

New replacement/podium 2 level store approx. 115,124 l.f. Safeway Store Building on Barbur Blvd. in Portland, Oregon with first floor parking, on-site, off-site, on-grade parking and upper level store. Demolition, single ply membrane roofing, canopies, CMU, stone veneer and EIFS exterior, steel deck and joist, aluminum entrances, poured in place concrete wall and precast concrete …

Continue reading ‘Safeway Store’ »

St. John’s Police Training Building, Skyward Construction

St. John’s Police Training Building remodel includes: remove existing metal roof system to roof deck, existing roof mounted bell to remain, repair roof substrate areas, install new Energy Star standing seam roofing system, custom stainless steel internal gutter system, new roof drains, under deck piping, drain sumps, flashings and other roofing components, repair upper section …

Continue reading ‘St. John’s Police Training Building, Skyward Construction’ »